When will the city install new utility services to a residence?

A paid receipt for utility connection charges is required to start the process of utility service installation. The City cannot install the service taps until you have cleared the area, established the final grade in the area of the water / sewer services, and heavy equipment will not be driving over the area of the taps. The customer is responsible for protecting the water meter and sewer tap during all construction activities. Should damage occur, the customer is responsible for paying the City for any repairs/replacement needed to restore the services to good working order. Following connection fee payment, contact the Utility T&D Department at 904-825-1043 to inquire about the schedule for your service installation.

Show All Answers

1. How can I get information about utility service?
2. What are utility flow-based fees for typical uses?
3. What are the payment options for utility connection charges?
4. How long will it take to provide water/sewer service to a residence?
5. When should I pay utility connection charges?
6. When will the city install new utility services to a residence?
7. Where will the new water/sewer services be located for my residence?
8. How do I unlock my water meter, set up, activate or change a city utility account?
9. Why are utility connection fees charged?
10. What do I need to do if I have a change-of-use, increase in use or additional use at my property?
11. If my water/sewer is already connected, why do I need an availability request form?
12. Are utility connection charges transferable or refundable?
13. Do utility connection charges expire?
14. What needs to happen if a building connected to city water and sewer is being demolished?
15. The property is outside city limits; why should I contact the City for utility service?
16. Is city water/sewer connection mandatory?
17. What is the difference between gravity sewer versus pressurized (forcemain) sewer?
18. How do I get installation and connection of private building service line to water/sewer service?
19. What are the requirements for existing well and septic tank after connection to city water/sewer?
20. What is the responsibility for maintenance and repair of service connections?
21. What is the landscape irrigation water meter?
22. What are the backflow prevention requirements?
23. Is the city responsible for water/sewer service installation?